 |
| Engine 4 and Water from the top of the stadium |
Crews advanced leader lines and high rise packs during drill night. Including hoisting the leader line up the side of the 100 foot stadium side and pumping water off the top of the stadium.
 |
| Engine 4 and Water from the top of the stadium |