In mid afternoon Station 1-3 (Denver Fire Co) was dispatched to a vehicle into a Commerical Business in the 700 Block of Ridge Road in East Cocalico Twp. Command 1-3 requested the duty officer from the Rescue Task Force to Respond. Eshleman and Zechman responded to evaluate the building. Crews from 1-3 installed temporary shoring being that the A/D corner had heavy damage from the vehicle entering Side A and exiting Side D. Collapse #1 was added onto the event for additional equipment and materials.
Crews from 6-5 installed two vertical posts and a finished a raker started by 1-3 crews.
 |
| Collapse #1 and 1-3 |
 |
| Side D |
 |
| Side A |
The Tech Folks from 6-5 cleared in one hour.